Nam Ngum 2 HEPP

Lao PDR

Owner:
Nam Ngum 2 Power Company Ltd.
Main Contractor:
CH Karnchang Lao Company Ltd.

Xayaburi Dam HEPP

View Project

Ingula Pumped Storage Scheme

View Project

Kalayaan / Caliraya / Botocan HEPP

View Project

The project consists of Design, Supply, Fabrication, Installation and Testing of:

60m of 10.7m diameter Headrace Lining.
10.7m x 8.75m x 6.2m Manifold x 125m long.
3 x Upper Penstocks 6.2m diameter.
3 x 52 degree Steel Lined Inclined Shafts 5.35m diameter x 110m long.
3 x Lower Penstocks 5.35m diameter x 70m long.
...
...
...
...