Marine Terminal, Port Sudan, Sudan
Owner:
Petrodar Operating Company Ltd.
Main Contractor:
Peremba Construction Sdn Bhd.
Design, Supply, Construction and commissioning of Approx 13,000 tonnes of storage tanks including 6 double deck floating roof tanks each 82.1 meters diameter and 86,000 diameter inch pipe work.
Fabrication of the Tanks and Pipework was carried out in a purpose built fabrication facilities fully equipped with automated plate cutting, auto blast and rolling machines. PWHT of shell plates and nozzles was carried out in the site workshop.